Built for GCs and trade partners who need signed scope before crews keep moving

Keep contractor-to-contractor change orders approved before extra scope turns into margin fights.

ChangeOrderApp gives general contractors, self-perform teams, and subcontractors one clean workflow to document added scope, send approvals, and protect margin before field directives disappear into calls, texts, and marked-up plans.

Faster PM approvalsCleaner subcontractor paper trailBuilt for contractor-to-contractor work
  • Built for GCs, supers, PMs, and specialty trades coordinating extra scope
  • Approval links keep office and field aligned without long email chains
  • Every change keeps a timestamped record of scope, dollars, schedule impact, and decision history
$24.3k
Revenue awaiting approval
1.8 days
Average approval time
47
Change orders

Problem

Crews keep moving. Approved scope often lags behind.

ChangeOrderApp helps contractor teams document site directives before added labor, material, and schedule impact turn into back charges, disputed T&M, or strained trade relationships.

Commercial tenant improvement space with plans, materials, and a contractor coordination setup

Trade Partner Workflow

Clean enough for a GC, practical enough for a subcontractor, and built to support approvals before the crew moves on.

Live queue

Demo data

Upgrade tile selection in main shower

Maple Street Kitchen Remodel

Sent
Sent 6 hours ago$2,430

Add electrical for conference room wall

Riverview Office Tenant Finish

Approved
Approved yesterday$6,980

Structural hardware upgrade

North Ridge Deck Expansion

Draft
Drafted today$1,190

Why teams switch

Stop letting extra scope bounce between supers, PMs, and subs.

The pain is not spotting the change. The pain is proving who requested it, what it costs, and whether the other contractor actually approved it before the work happened.

Field directives arrive before paperwork

Supers ask the crew to keep moving, but pricing and approval still sit in texts, calls, or marked-up sheets.

Subcontractors carry the risk too long

When scope changes stay informal, trade partners end up financing extra labor and material while they wait for a yes.

Back charges and disputes show up late

Without a clean record, the argument comes later over schedule impact, T&M tags, pricing, or whether the added work was really directed.

How it works

One workflow from site directive to signed contractor approval.

Document scope, dollars, and approval status in one place so the superintendent, PM, and trade partner all work from the same version of the change.

  • Capture the field directive

    Log photos, notes, labor, material, and schedule impact while the added work is still happening on site.

  • Send one clean approval request

    The receiving PM or trade partner gets a professional summary instead of a scattered chain of texts and emails.

  • Track what is approved, pending, or slipping

    The office gets a live queue instead of chasing who owes a response across multiple jobs.

Best fit

Start with teams that manage extra scope every week across the job chain.

Specialty subcontractors

Ideal for electrical, plumbing, framing, drywall, and finish trades that need approvals before extra work gets forgotten.

Tenant improvement GCs

Useful when PMs, supers, and trade partners need one faster lane for added scope on active commercial jobs.

Self-perform contractors

Helps internal field teams and project managers stay aligned when labor, equipment, and schedule impact move quickly.

Rollout

Designed to fit an active jobsite on day one.

You do not need a giant PM rollout to start. The right GC or subcontractor should be able to document and send a real contractor approval the same afternoon they create a workspace.

Step 1

Create a workspace and invite the PM, superintendent, estimator, or operations lead.

Step 2

Build the first change order from a live project with site photos, labor, material, and schedule impact.

Step 3

Send the approval request to the GC, owner rep, or trade partner and track what is still pending.

Pricing

Same Solo plan for GCs and trade partners.

Every workspace starts with a 14-day trial (up to four change orders). Subscribe to Solo when contractor-to-contractor approvals are part of how you run the job.

Solo

$19.99/mo

For supers, PMs, and trade leads who need signed scope before crews assume extra work.

One seat, unlimited change orders after you subscribe, professional approval requests, and a live queue—plus email notifications when you configure outbound mail.

The price shown is a guide; Stripe checkout shows the current rate for your workspace. Need a different setup as you scale? Contact us and we will figure out what fits.

Final word

If one contractor is directing extra work, the approval should keep up.

ChangeOrderApp helps GCs and trade partners document what changed, send it cleanly, and protect margin before a site directive turns into a payment dispute between contractors.